even

Your breakouts, finally figured out.

Snap a selfie. Get your acne score, a morning and night plan, and a rescan every week.

Faces like yours.

Breakouts, redness, marks that hang around. Whatever’s going on, you’ll see it named and scored.

  • Selfie, straight on: dark hair pulled back, a small whitehead on the forehead.WhiteheadForehead
  • Selfie: long curly hair, a nose stud, a few dark marks on one cheek.Dark marksCheek
  • Selfie: curly hair in a bun, freckles across both cheeks.3 small bumpsForehead
  • Selfie: blonde hair, flushed pink cheeks, a soft smile.RednessCheeks
  • Selfie: curly updo, pink hoodie, a wide smile.Dark marksCheeks
  • Selfie: messy dark hair, gold hoops, a pink nose and cheeks.RednessNose
  • Selfie: long dark hair, strong brows, shadows under the eyes.Dark circlesUnder-eyes
  • Close-up selfie: a bob with bangs, warm indoor light.Visible poresNose
  • Bathroom selfie: holding a dropper bottle to her cheek, a small red bump on her jaw.BreakoutJaw
  • Selfie in bed: red braids, rosy cheeks, hand on her cheek.RednessCheeks
  • Golden-hour street selfie: a bob with bangs, a few small bumps on her cheeks.Small bumpsCheeks
  • Low-angle selfie, laughing, long brown hair, a few red marks on one cheek.Red marksCheek
  • Selfie after washing up: towel headband, dark marks on her cheeks.Dark marksCheeks
  • Selfie, straight on: freckles, dark hair clipped back, black tee.Uneven toneCheeks
  • Selfie: long dark hair, a big gap-tooth smile, fairy lights.Some shineT-zone
  • Golden-hour street selfie: long wavy hair, a big smile.Smooth textureCheeks

Your skin, decoded from one selfie.

  1. Take a selfie

    Straight on, good light, bare skin. That’s it.

  2. See what’s going on

    Scores out of 100, and the spots behind each one.

  3. Follow your plan

    Morning and night, with products that match your skin.

  4. Rescan every week

    Same light, same angle. See what changed.

Week 1 → Week 8

Watch it change.

A new selfie each week, same light. Every score tracked, breakouts first.

Overall 77to84

The same selfie, week 1 on the left with small red bumps on her forehead, cheeks and chin, and week 8 on the right, much clearer.
Week 1
Acne66
Fair
Week 8
Acne86
Good+20
Your skin score, up 7 since your first scan, with a line chart climbing from August to September.
What changed since your first scan: Acne up 20 to 86 (your focus), Dark spots up 8 to 66, Redness up 7 to 84, and more.
First win: your acne score went up, 86, plus 10 since your last scan.

Acne first. Then eight more.

Nine scores, 0 to 100. Higher is better.

  • AcneEvery breakout, big or small: where it is and how many.
  • RednessFlushing and leftover pink.
  • Dark spotsMarks breakouts leave behind.
  • PoresHow much they show.
  • TextureHow smooth your skin looks up close.
  • OilShine, and where it builds up.
  • EvennessTone, cheek to cheek.
  • Under-eyesDarkness and puffiness.
  • Fine linesEarly lines, around the eyes.

Every score lands in a band:

Great 90–100 Good 70–89 Fair 40–69 Needs care 0–39

Your week 1 is a selfie away.

An acne score, a plan for tonight, and a rescan every week.

even

skincare scanner

For iPhone